General Information
Beginning of works: | February 2008 |
---|---|
Completion: | August 2010 |
Duration of works: | 31 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-prestressed concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Ebenheim, Gotha (Kreis), Thuringia, Germany |
---|---|
Part of: | |
Coordinates: | 50° 58' 42" N 10° 29' 3" E |
Technical Information
Dimensions
total length | 414.00 m | |
span lengths | 42.00 m - 55.00 m - 70.00 m - 80.00 m - 70.00 m - 55.00 m - 42.00 m | |
number of spans | 7 | |
horizontal radius of curvature | 2 500 m | |
bridge surface | 14 904 m² | |
superelevation | 3.5% | |
deck | girder depth | 2.70 - 3.735 m |
Quantities
deck | concrete volume | 6 376 m³ |
prestressing steel | 53 t | |
reinforcing steel | 1 792 t | |
substructure | concrete volume | 9 040 m³ |
reinforcing steel | 1 012 t |
Cost
cost of construction | Euro 27 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
prestressed concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Architecture
- Ursulina Schüler-Witte (architect)
- Ralf Schüler (architect)
Structural engineering
- HOCHTIEF Consult Infrastructure
- Ingenieurgemeinschaft Setzpfandt GmbH & Co. KG
- KREBS+KIEFER Ingenieure GmbH
Geotechnical/geological experts
Checking engineering
- Heinz Schmackpfeffer
- Karsten Geißler (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 53-80.
- About this
data sheet - Structure-ID
20064773 - Published on:
20/03/2013 - Last updated on:
06/10/2016