General Information
Completion: | 1985 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span cable-stayed bridge |
---|---|
Function / usage: |
Pipeline bridge |
Structure: |
Cable-stayed bridge with fan system |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Neckarsulm, Heilbronn (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 12' 16.21" N 9° 13' 1.83" E |
Technical Information
Dimensions
total length | 102.50 m |
Materials
pylon |
steel
|
---|
Participants
Design
Structural engineering
Construction
Relevant Web Sites
Relevant Publications
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 134-135. (1999):
- About this
data sheet - Structure-ID
20005315 - Published on:
22/09/2002 - Last updated on:
28/05/2021