Neckar River Bridge between Kirchheim and Gemmrigheim
General Information
Other name(s): | Neckarbrücke zwischen Kirchheim und Gemmrigheim |
---|---|
Beginning of works: | 1995 |
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Warren type truss bridge Continuous truss bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Kirchheim am Neckar, Ludwigsburg (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 2' 2.19" N 9° 9' 5.10" E |
Technical Information
Dimensions
span lengths | 42 m - 41m - 41m - 42 m | |
number of spans | 4 | |
deck | deck depth | 3.55 m |
deck width | 11.50 m |
Materials
superstructure |
composite steel-reinforced concrete
|
---|
Chronology
October 1995 | Construction phase 1 |
---|---|
1 November 1996 | Completion of new superstructure, temporary bridges, load testing; |
27 July 1997
— 30 July 1997 |
New superstructure is moved sideways into place |
13 August 1997 | Opened to traffic |
Participants
Design
Checking engineering
- Reiner Saul (checking engineer)
Construction supervision
Project management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die neue Neckarbrücke zwischen Kirchheim und Gemmrigheim. In: Stahlbau, v. 67, n. 1 (January 1998), pp. 36-45. (1998):
- About this
data sheet - Structure-ID
20000094 - Published on:
07/03/1999 - Last updated on:
05/02/2016