0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Neckar River Bridge between Kirchheim and Gemmrigheim

General Information

Other name(s): Neckarbrücke zwischen Kirchheim und Gemmrigheim
Beginning of works: 1995
Completion: 1997
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Neckar River
Coordinates: 49° 2' 2.19" N    9° 9' 5.10" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 42 m - 41m - 41m - 42 m
number of spans 4
deck deck depth 3.55 m
deck width 11.50 m

Materials

superstructure composite steel-reinforced concrete

Chronology

October 1995

Construction phase 1

1 November 1996

Completion of new superstructure, temporary bridges, load testing;
Construction phase 2

27 July 1997
— 30 July 1997

New superstructure is moved sideways into place

13 August 1997

Opened to traffic

Participants

Design
Checking engineering
Construction supervision
Project management

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000094
  • Published on:
    07/03/1999
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine