0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 2011
Duration of works: 28 months
Status: in use

Project Type

Awards and Distinctions

2013 entry  

Location

Location: , , ,
Address: Bundesstrasse 14
Replaces: Murr Valley Viaduct (1949)
Coordinates: 48° 56' 34" N    9° 24' 50" E
Show coordinates on a map

Technical Information

Dimensions

width 14.25 m
height 25 m
total length 418.60 m
main spans 2 x 107.57 m
span lengths 3 x 24.00 m - 19.88 m - 2 x 107.57 m - 19.58 m - 3 x 24.00 m - 20.00 m
number of spans 11
bridge surface 5 777 m²
arch width 2 m
depth 1.40 m
deck girder depth 1.20 m
piers width 1.6 m
depth 1.0 m

Quantities

deck concrete volume 3 500 m³
prestressing steel 190 t
reinforcing steel 500 t
substructure concrete volume 7 500 m³
reinforcing steel 900 t

Cost

cost of construction Euro 15 000 000

Materials

deck prestressed concrete
piers reinforced concrete (C 35/45)
arches reinforced concrete (C 50/60)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003266
  • Published on:
    17/05/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine