General Information
Project Type
Structure: |
Arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Backnang, Rems-Murr-Kreis, Baden-Württemberg, Germany |
---|---|
Carries: |
|
Replaced by: |
Murr Valley Viaduct (2011)
|
Technical Information
Dimensions
height | 28 m | |
total length | 403 m | |
arch span | 104.20 m | |
deck | deck width | 11.50 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arches |
steel
|
deck of approach viaduct |
reinforced concrete
|
Chronology
1948 — 1949 | Reconstruction of the former reinforced concrete arch bridge in steel. Part of the concrete approaches are re-used. Deck width on the new sections is smaller than on the existing parts. |
---|---|
1983 — 1985 | Deck is widened so that the entire bridge has a constant width. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 27-29. (1999):
- About this
data sheet - Structure-ID
20001207 - Published on:
26/01/2001 - Last updated on:
05/02/2016