General Information
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Bruck an der Mur, Styria, Austria |
---|---|
Coordinates: | 47° 24' 34" N 15° 16' 26" E |
Technical Information
Dimensions
span | 66.5 m | |
total width | 18.00 m | |
roadway / carriageway width | 12.50 m | |
arch | rise | 28.00 m |
span | 72.00 m | |
crossing angle | 22° | |
deck | span | 66.50 m |
deck width | 15 m | |
main girders | girder depth | 1.30 m |
piles | diameter | 1.20 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arches |
steel
|
Participants
Owner
Structural engineering
-
Kupsa & Morianz ZT Gesellschaft m.b.H. für Bauingenieurswesen
- Helmut Kupsa (structural engineer)
- Harald Hafner (structural engineer)
-
Institut für Stahlbau (Technische Universität Graz)
- Harald Unterweger (expert)
Co-contractor
Steel construction
Concrete construction
Material supplier
Construction supervision
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Konstruktive Auslegung, Berechnung und Ausführung einer außergewöhnlichen Bogenbrücke in Stahl-Verbundbauweise. In: Stahlbau, v. 82, n. 5 (May 2013), pp. 351-362. (2013):
- About this
data sheet - Structure-ID
20063237 - Published on:
22/06/2012 - Last updated on:
06/05/2023