0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Radfeld-Wiesing Tunnel; Jenbach Tunnel
Beginning of works: 2008
Completion: 2012
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel

Location

Location: , ,
, ,
, ,
Part of:
Coordinates: 47° 27' 4.96" N    11° 55' 37.83" E
Coordinates: 47° 22' 46.43" N    11° 45' 2.25" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 15 990 m
number of tracks 2
Lot H2-1 (Radfeld/Brixlegg)
length 4 186 m
Lot H2-2 (Radfeld Mitte)
length 2 390 m
Lot H3-4 (Münster/Wiesing)
length 5 835 m
Lot H8 (Jenbach)
length 3 470 m
tunnel section area 133 m²
excavation diameter 13 m

Design Loads

design speed 220 km/h

Participants

Owner
Lot H8 (Jenbach)
Co-contractor
Electronic construction diary
Electronic drawing management

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008964
  • Published on:
    03/04/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine