General Information
Other name(s): | BW 41a |
---|---|
Beginning of works: | 1996 |
Completion: | 1998 |
Duration of works: | 36 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Dessau-Roßlau, Saxony-Anhalt, Germany |
---|---|
Carries: |
|
Part of: | |
Connects to: |
Dessau Mulde Bridge (1998)
|
Coordinates: | 51° 47' 35.93" N 12° 16' 33.51" E |
Technical Information
Dimensions
main span | 36.50 m | |
total length | 2 x 154 m | |
number of spans | 5 | |
bridge surface | 5 200 m² | |
deck | deck width | 2 x 16.94 m |
Cost
cost of construction | German Mark 10 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Alternative design
Structural engineering
Architectural consulting
Checking engineering
- Specht (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 41-46.
- About this
data sheet - Structure-ID
20006247 - Published on:
15/10/2002 - Last updated on:
05/02/2016