General Information
Completion: | 1972 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Steel bridge |
Structure: |
original configuration: Girder bridge current configuration: Three-span cable-stayed bridge |
Location
Location: |
Amsterdam, North Holland, Netherlands Muiden, North Holland, Netherlands |
---|---|
Address: | A1 |
Next to: |
Betlembrug (2017)
|
Coordinates: | 52° 19' 56.80" N 5° 0' 52.99" E |
Technical Information
Materials
deck |
steel
|
---|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and execution of the strengthening of the Muiderbridge. In: Bauingenieur, v. 85, n. 6 (June 2010). (2010):
- Umbau der Muiderbrücke bei Amsterdam mit CEM III/A 52,5 N. In: Beton-Informationen, n. 5 ( 2010), pp. 74. (2010):
- About this
data sheet - Structure-ID
20059049 - Published on:
07/11/2010 - Last updated on:
05/08/2022