General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Three-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Muiden, North Holland, Netherlands |
---|---|
Next to: |
Muider Bridge (1972)
|
Coordinates: | 52° 19' 50.36" N 5° 0' 57.40" E |
Technical Information
Dimensions
total length | 284 m | |
span lengths | 71 m - 142 m - 71 m | |
number of spans | 3 | |
number of lanes | 4 + 2 + 3 | |
deck | deck width | 20.9 m + 11.25 m + 17.6 m |
girder depth | 2.75 - 6.25 m |
Quantities
prestressing steel | 1 060 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
ARK Bridge belongs to Amsterdam’s largest infrastructure project
A huge infrastructural project is currently under construction in the metropolitan area of Amsterdam. The SAA (Schiphol-Amsterdam-Almere) project will improve the motorway network between Amsterdam, Schiphol ... [more]
Participants
Owner
Design
Design-build-finance-maintain contractor
Structural engineering
Checking engineering
- Peter Heijmans (checking engineer)
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bauwerke im Zuge des PPP-Projektes SAAone in den Niederlanden. Drei Brücken über den Amsterdam-Rhein-Kanal und die zweite Hollandse Brug. In: Brückenbau, v. 9, n. 1-2 ( 2017), pp. 108-115. (2017):
- About this
data sheet - Structure-ID
20073151 - Published on:
12/07/2017 - Last updated on:
05/08/2022