MT3 Viaduct

General Information

Official designation: MT3
Beginning of works: 2014
Duration of works: 54 months
Status: under construction

Project Type

Location

Location: ,
, ,
Part of:
Coordinates: 20° 53' 6.51" S    55° 23' 24.30" E
Coordinates: 20° 52' 25.82" S    55° 25' 39.64" E
Coordinates: 20° 53' 27.51" S    55° 22' 51.20" E
Show coordinates on a map

Technical Information

Dimensions

width 28.90 m
total length 5 409 m
standard span lengths 120 m
deck
precast elements (RC) number 1 386
piers
number 48

Quantities

deck
concrete volume 145 000 m³
piers
concrete volume 99 400 m³
reinforcing steel 20 840 t

Cost

cost of construction (incl. taxes) Euro 715 690 332.87

Materials

deck precast prestressed concrete
piers precast reinforced concrete
abutments reinforced concrete

Products, Services & Reports

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structur ...

[more]

On Réunion Island in the Western Indian Ocean, the strategically important ocean road RN1 linking the commercial port to the administrative capital ...

[more]

Advertisement

Participants

Design
Architecture
Checking engineering
  • Apave (launching gantry)
Co-contractor
Steel construction
Prestressing
Material supplier
Reinforcing steel
Pot bearings
Formwork

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20068080
  • Date created
    25/11/2015
  • Last Update
    25/09/2018