General Information
Completion: | 1976 |
---|---|
Status: | completed |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Function / usage: |
Tramway, light or metro rail bridge Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Coordinates: | 45° 46' 7.05" N 4° 50' 22.39" E |
Technical Information
Dimensions
total length | 187 m | |
span lengths | 49 m - 89 m - 49 m | |
number of spans | 3 | |
web thickness | 0.36 m | |
thickness of bottom flange | 0.18 - 0.32 m | |
deck | deck depth | 4.50 - 6.90 m |
deck slab thickness | 0.20 m |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Lyon - Pont Morand sur le Rhône. In: Bulletin annuel AFPC ( 1976- 1977), pp. 313-319.
- Métro de Lyon. La construction du pont mixte rail-route Morand-bis en béton précontraint sur le Rhône. Presented at: La technique française du béton précontraint - VIIIe Congrès de la Précontrainte FIP 1978 - AFB, pp. 219-223. (1978):
- Métro de Lyon. La construction du pont mixte rail-route Morand-bis en béton précontraint, sur le Rhône. Lyons metro. The construction of the combined railroad-highway bridge at Morand-bis of pre-stressed concrete, over the Rhone river. Presented at: 12ème Congrès de l'AIPC Vancouver 3-7.9.1984, pp. 45-59. (1984):
- Métro de Lyon: le pont rail-route Morand. In: Travaux, n. 480 (March 1975), pp. 43. (1975):
- Ponts et Quais de Lyon. Editions Lyonnaises d'Art et d'Histoire, Lyon (France), pp. 128. (2002):