0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Métro de Lyon. La construction du pont mixte rail-route Morand-bis en béton précontraint, sur le Rhône

Lyons metro. The construction of the combined rail­road-highway bridge at Morand-bis of pre-stressed concrete, over the Rhone river

Author(s):



Medium: conference paper
Language(s): English, French
Conference: 12ème Congrès de l'AIPC Vancouver 3-7.9.1984
Published in:
Page(s): 45-59
Year: 1984

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015932
  • Published on:
    26/09/2004
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine