0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2010s
Duration of works: 10 months
Status: in use

Project Type

Location

Location: , ,
Coordinates: 28° 31' 55.75" S    29° 48' 22" E
Show coordinates on a map

Technical Information

Dimensions

main bridge
number of spans 3
ramps
number of spans 2 x 5

Materials

piers reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071915
  • Published on:
    20/10/2016
  • Last updated on:
    08/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine