General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nievroz, Ain (01), Auvergne-Rhône-Alpes, France Jons, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Carries: |
|
Crosses: |
|
Part of: | |
Next to: |
Viaduc de Miribel-Jonage (1991)
|
Coordinates: | 45° 48' 30.83" N 5° 3' 51.05" E |
Technical Information
Dimensions
total length | 530 m | |
span lengths | 46.80 m - 4 x 50.440 m - 43.368 m - 43.247 m - 42.700 m - 47.643 m - 53.236 m - 46.800 m | |
number of spans | 11 | |
web thickness | 0.400 m | |
deck | deck depth | 3.200 m |
deck width | 12.450 m |
Cost
construction cost (without tax) | Euro 9 000 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Design
-
egis jmi
- Nabil Yazbeck (structural engineer)
Structural engineering
Contractor
Subcontractor
Prestressing
Reinforcing steel
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Doublement du viaduc de Miribel-Jonage sur l'A432. In: Bulletin annuel de l'AFGC, n. 6 ( 2004), pp. 15-18.
- Doublement du viaduc de Miribel-Jonage: L'art délicat de la copie conforme. In: Construction moderne ( 2003), pp. 34-36. (2003):
- Nouveau viaduc de Miribel-Jonage. In: Chantiers de France, n. 354 (October 2002), pp. 22-23. (2002):
- About this
data sheet - Structure-ID
20007878 - Published on:
17/01/2003 - Last updated on:
05/02/2016