General Information
Name in local language: | Minna-Todenhagen-Brücke |
---|---|
Beginning of works: | 2013 |
Completion: | 21 December 2017 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Continuous truss bridge Warren type truss bridge Deck truss bridge |
Support conditions: |
for registered users |
Structure: |
Non-parallel chord truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Berlin-Niederschöneweide, Treptow-Köpenick, Berlin, Germany Berlin-Oberschöneweide, Treptow-Köpenick, Berlin, Germany |
---|---|
Crosses: |
|
Coordinates: | 52° 28' 7.67" N 13° 30' 1.04" E |
Technical Information
Dimensions
total length | 420.00 m | |
span lengths | 45.00 m - 75.00 m - 102.50 m - 157.50 m - 45.00 m | |
number of spans | 5 | |
bridge surface | 9 954.00 m² | |
number of lanes | 2 x 2 | |
abutments | number | 2 |
deck | deck depth | 1.20 - 10.00 m |
deck width | 2 x 12.45 m | |
on-center distance between girders | 6.50 m | |
number of longitudinal girders | 2 | |
piers | number | 4 |
piles 10-30 | diameter | 1.20 m |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
(S 355 J2+N)
|
deck slab |
reinforced concrete
(C 45/55)
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Architecture
Structural engineering
Checking engineering
- Wolfgang Hensel (checking engineer)
Co-contractor
Relevant Web Sites
Relevant Publications
- Neue Spreebrücke in Berlin. Teil der Süd-Ost-Verbindung von der A 113. In: Brückenbau, v. 9, n. 1-2 ( 2017), pp. 163-171. (2017):
- About this
data sheet - Structure-ID
20079775 - Published on:
13/08/2020 - Last updated on:
02/11/2023