0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2010
Completion: 17 April 2014
Status: in use

Project Type

Structure: Cantilever truss bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
, , ,
Address: U.S. Route 421
Crosses:
  • Ohio River
Carries:
  • U.S. Route 421
Replaces: Milton Madison Bridge (1929)
Coordinates: 38° 43' 44.79" N    85° 22' 12.46" W
Show coordinates on a map

Technical Information

Dimensions

total length 970 m

Cost

cost of construction United States dollar 103 000 000

Materials

truss steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20058439
  • Published on:
    01/10/2010
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine