0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1928
Completion: 20 December 1929
Status: demolished (2014)

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Ohio River
Carries:
  • U.S. Route 421
Replaced by: Milton-Madison Bridge (2014)
Coordinates: 38° 43' 45" N    85° 22' 12" W
Show coordinates on a map

Technical Information

Dimensions

main span 220 m
width 6.1 m
total length 970 m

Cost

cost of construction United States dollar 1 365 101.84

Materials

piers reinforced concrete
truss steel

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20009508
  • Published on:
    27/06/2003
  • Last updated on:
    01/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine