General Information
Completion: | July 2019 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Tramway, light or metro rail bridge |
---|---|
Structure: |
T-section girder bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Port Louis, Mauritius |
---|---|
Part of: | |
Coordinates: | 20° 10' 57.83" S 57° 28' 22.39" E |
Technical Information
Dimensions
total length | 248 m | |
main spans | 30 m | |
number of spans | 7 | |
height above valley floor or water | 28 m | |
number of tracks | 2 | |
track gauge | 1 435 mm | |
deck | deck width | 9.7 m |
piers | number | 10 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20081517 - Published on:
27/08/2021 - Last updated on:
27/08/2021