0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2 October 2019
Status: in use

Project Type

Function / usage: Tramway line

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 26 km
number of tracks 2
track gauge 1 435 mm

Design Loads

design speed max. 80 km/h

Chronology

2 October 2019

Opening of Phase I: (soft launch) from Port Louis Victoria to Rose Hill Centra.

10 January 2020

Commercial operations begin.

20 June 2021

Phase 2a from Port Louis Victoria to Quatre Bornes Central opens.

December 2022

Opening of Phase 2b from Port Louis Victoria to Curepipe Central.

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20081515
  • Published on:
    27/08/2021
  • Last updated on:
    27/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine