General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Steel bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
main bridge: Vertical lift bridge main bridge: Through truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaducts: Deck truss bridge |
Awards and Distinctions
2003 |
award winner
for registered users |
---|---|
1937 |
First Place
for registered users |
Location
Technical Information
Dimensions
total length | 1225.9 m | |
span lengths of main bridge | 3 x 164.6 m | |
length of movable span | 164.6 m |
Cost
cost of construction | United States dollar 12 170 000 |
Materials
towers |
steel
|
---|---|
truss |
steel
|
Chronology
1 June 1936 | Beginning of construction. |
---|---|
3 July 1937 | Opening. |
Participants
Initial construction
Design
Consulting engineers
- Robinson & Steinman (main bridge)
- Waddell and Hardesty
Architectural consulting
- Aymar Embury II (architect)
Steel construction
Deck replacement
Owner
Structural engineering
- Charles Gozdziewski (structural engineer)
- William E. Nyman (structural engineer)
Consulting engineers
General contractor
Steel fabrication
Relevant Web Sites
- About this
data sheet - Structure-ID
20006078 - Published on:
11/10/2002 - Last updated on:
01/10/2019