0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Ponte Maria Pia
Other name(s): Pia Maria Bridge
Beginning of works: 5 January 1876
Completion: 8 October 1877
Status: out of service

Project Type

Awards and Distinctions

Location

Location: , ,
, ,
Crosses:
  • Douro River
Replaced by: São João Bridge (1991)
See also: Dom Luís I Bridge (1886)
Coordinates: 41° 8' 23.38" N    8° 35' 49.23" W
Show coordinates on a map

Technical Information

Dimensions

total length 563 m
arch span 160 m
height above valley floor or water 61.20 m
number of tracks 1
deck deck width 6.0 m

Cost

cost of construction French Franc 965 000

Materials

arch cast iron

Chronology

4 November 1877

Inauguration

1991

Rail services are transfered to the adjacent São João Bridge.

Participants

Design
Construction

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000054
  • Published on:
    28/10/1998
  • Last updated on:
    07/11/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine