0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Main-Neckar-Brücke
Completion: 1927
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Main River
Replaces: Main-Neckar Bridge (1882)
Coordinates: 50° 5' 44.99" N    8° 39' 14" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 5 x 53.985 m
number of spans 5

Cost

cost of construction Reichsmark 1 600 000

Materials

truss steel

Chronology

March 1945

Bridge is blown up.

November 1945

Preparation for reconstruction begins.

7 January 1946

Actual recovery and reconstruction begins, though hindered by ice on the river.

23 November 1946

Reconstruction completed.

1978

Scouring is detected at the piers and repaired.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005230
  • Published on:
    20/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine