General Information
Other name(s): | Main-Neckar-Brücke |
---|---|
Completion: | 1927 |
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Location: |
Frankfurt, Hesse, Germany |
---|---|
Crosses: |
|
Replaces: |
Main-Neckar Bridge (1882)
|
Coordinates: | 50° 5' 44.99" N 8° 39' 14" E |
Technical Information
Dimensions
span lengths | 5 x 53.985 m | |
number of spans | 5 |
Cost
cost of construction | Reichsmark 1 600 000 |
Materials
truss |
steel
|
---|
Chronology
March 1945 | Bridge is blown up. |
---|---|
November 1945 | Preparation for reconstruction begins. |
7 January 1946 | Actual recovery and reconstruction begins, though hindered by ice on the river. |
23 November 1946 | Reconstruction completed. |
1978 | Scouring is detected at the piers and repaired. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Frankfurter Brücken. Schleusen, Fähren, Tunnels und Brücken des Mains. Societäts-Verlag, Frankfurt (Germany), pp. 175-180. (1982):
- About this
data sheet - Structure-ID
20005230 - Published on:
20/09/2002 - Last updated on:
05/02/2016