Main-Donau-Kanalbrücke Erlangen (A3, 2015)

General Information

Official designation: BW 379b
Beginning of works: March 2014
Completion: 11 December 2015
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Main-Danube Canal
Carries:
  • Autobahn A3
Replaces: Main-Donau-Kanal-Brücke Erlangen (A3, 1961) (1961)
Crosses: Rhine-Main-Danube Canal (1992)
Carries: A 3 Motorway (Germany) (1984)
Coordinates: 49° 33' 36.98" N    10° 58' 13.34" E
Show coordinates on a map

Technical Information

Dimensions

deck width 2 x 18.85 m
bridge surface 3 544 m²
number of lanes 2 x 3
arches arch span 94.00 m
arch height 13.50 m
on-center distance between girders 20.75 m
deck deck slab thickness 0.32 m
roadway / carriageway width 2 x 15.25 m
superelevation 3 %
piles diameter 1.20 m

Quantities

deck shear studs 6.5 t
substructure concrete volume 3 900 m³
reinforcing steel 445 t
superstructure structural steel 1 960 t
concrete volume 1 200 m³
reinforcing steel 425 t

Design Loads

live load LM1 / LMM
design code(s) DIN EN 1991-2/NA

Cost

cost of construction Euro 12 700 000

Materials

deck composite steel-reinforced concrete
arches steel
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Brücken und Tunnel der Bundesfernstraßen 2017. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2017, pp. 7-20.
  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: Curbach, Manfred (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20068137
  • Published on:
    17/12/2015
  • Last updated on:
    16/02/2018