0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Lorrainebrücke
Beginning of works: February 1928
Completion: 17 May 1930
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Concrete bridge

Location

Location: , ,
Crosses:
  • Aare River
Replaces: Red Railroad Bridge (1858)
Coordinates: 46° 57' 10.26" N    7° 26' 35.72" E
Show coordinates on a map

Technical Information

Dimensions

width 18 m
total length 178 m
height above valley floor or water 37.5 m

Cost

cost of construction Swiss Franc 3 600 000

Materials

arch concrete

Participants

Structural engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001004
  • Published on:
    30/09/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine