General Information
Other name(s): | Lockwitztalbrücke |
---|---|
Beginning of works: | 2001 |
Completion: | 13 December 2005 |
Duration of works: | 56 months |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Reinforced concrete bridge |
Construction method: |
deck: Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2008 |
entry
for registered users |
---|
Location
Location: |
Dresden, Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 58' 44.95" N 13° 47' 42.18" E |
Technical Information
Dimensions
main span | 125 m | |
height | ca. 62 m | |
total length | 723 m | |
span lengths | 48.00 m - 60.00 m - 65.00 m - 70.00 m - 85.00 m - 2 x 125.00 m - 85.00 m - 60.00 m | |
number of spans | 9 | |
bridge surface | 21 329 m² | |
total width | 29.50 m | |
deck | deck depth | 3.00 m |
Quantities
abutments | concrete volume | 580 m³ |
deck | structural steel | 4 890 t |
concrete volume | 8 790 m³ | |
reinforcing steel | 2 400 t | |
foundations | concrete volume | 5 370 m³ |
substructure | concrete volume | 14 900 m³ |
reinforcing steel | 2 780 t |
Cost
cost of construction | Euro 35 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arches |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Construction engineers
Checking engineering
- Gert König (checking engineer)
Contractor
Bearing installation
Construction supervision
Concrete repair
(role unknown)
Relevant Web Sites
Relevant Publications
- Die Brücke Lockwitztal - eine Revision nach Entwurf und Ausführung. In: Stahlbau, v. 76, n. 6 (June 2007), pp. 359-371. (2007):
- Brücken in Deutschland II. für Straßen und Wege. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-46-0, pp. 156-157. (2007):
- Brücken und Tunnel der Bundesfernstraßen 2006. Deutscher Bundes-Verlag, Cologne (Germany), 2006, pp. 77-90.
- Entwicklungspotenzial im Straßenbrückenbau durch den Einsatz von hybriden Tragstrukturen - Teil 1: Balkenbrücken. In: Stahlbau, v. 82, n. 10 (October 2013), pp. 726-741. (2013):
- Der Entwurf der neuen Lockwitztalbrücke im Zuge der Bundesautobahn Dresden-Prag. In: Stahlbau, v. 69, n. 11 (November 2000), pp. 859-870. (2000):
- About this
data sheet - Structure-ID
20001952 - Published on:
09/09/2001 - Last updated on:
05/02/2016