General Information
Other name(s): | Talbrücke Lieser |
---|---|
Beginning of works: | 2005 |
Completion: | 2008 |
Duration of works: | 33 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nerdlen, Vulkaneifel, Rhineland-Palatinate, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 13' 40" N 6° 51' 6" E |
Technical Information
Dimensions
total length | 578.00 m | |
span lengths | 69.0 m - 5 x 88.0 m - 69.0 m | |
deck width | 29.50 m | |
number of spans | 7 | |
bridge surface | 17 051 m² |
Quantities
concrete volume | 30 000 m² | |
prestressing steel | 660 t | |
reinforcing steel | 3 200 t |
Cost
cost of construction | ca. Euro 19 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Original design
- Ruhrberg Ingenieurgemeinschaft
- H. Römer (architectural consultant)
Structural engineering
Geotechnical/geological experts
Checking engineering
- Hubert Verheyen (checking engineer)
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), pp. 57-67.
- About this
data sheet - Structure-ID
20019340 - Published on:
05/02/2006 - Last updated on:
05/02/2016