General Information
| Name in local language: | Rheinbrücke Leverkusen |
|---|---|
| Beginning of works: | 14 December 2017 |
| Completion: | 2026 |
| Status: | under construction |
Project Type
| Structure: |
Cable-stayed bridge with semi-fan system Three-span cable-stayed bridge |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge |
| Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
| Support conditions: |
for registered users |
| Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Cologne, North Rhine-Westphalia, Germany Leverkusen, North Rhine-Westphalia, Germany |
|---|---|
| Crosses: |
|
| Carries: |
|
| Replaces: |
Leverkusen Bridge (1965)
|
| Coordinates: | 51° 2' 2.68" N 6° 57' 36.96" E |
Technical Information
Dimensions
| total length | 1 061.00 m | |
| span lengths | 59.8 m - 5 x 62.00 m - 59.6 m - 2 x 74.00 m - 280.0 m - 2 x 74.0 m - 55.7 m | |
| number of spans | 13 | |
| bridge surface | 65 174 m² | |
| number of lanes | 2 x 5 | |
| deck | deck width | 33.50 m |
| girder depth | 3.18 m | |
| main bridge | ||
|---|---|---|
| total length | 690 m | |
| western approach viaduct | ||
| total length | 378 m | |
Materials
| piers |
reinforced concrete
|
|---|---|
| pylons |
steel
|
| abutments |
reinforced concrete
|
Case Studies and Applied Products
Special Bearings and Noise Reduction for Leverkusen
Special restraints for the bearings and noise reduction on the expansion joints – MAURER supplied high-quality special elements for the first new section of the bridge over the Rhine in Leverkusen.
[more]Participants
Owner
Client
Design
Architecture
Bearings
Expansion joints
Relevant Web Sites
Relevant Publications
- (2020): Ersatzneubau der Rheinbrücke Leverkusen – Gesamtplanung des 8-streifigen Ausbaus der A1 zwischen Köln und Leverkusen. Presented at: 30. Dresdner Brückenbausymposium, 9./10. März 2020, Dresden (Germany), pp. 123-138.
- (2022): Reemplazo de dos puentes atirantados sobre el Rin: el puente de Leverkusen y el puente de Duisburg. In: Hormigón y acero, v. 73, n. 297 ( 2022), pp. 23-30.
- About this
data sheet - Structure-ID
20074378 - Published on:
14/12/2017 - Last updated on:
02/09/2024



