General Information
Other name(s): | Viaduc Léon-Blum |
---|---|
Beginning of works: | March 2012 |
Completion: | 6 February 2014 |
Status: | in use |
Project Type
Structure: |
Two-hinged rigid-frame bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Deck truss bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Poitiers, Vienne (86), Nouvelle-Aquitaine, France |
---|---|
Address: | Avenue de Nantes / Boulevard Solférino |
Crosses: |
|
Coordinates: | 46° 35' 5.23" N 0° 20' 5.17" E |
Technical Information
Dimensions
width | ø 14 m | |
total length | 330 m | |
main spans (3x) | 81 m | |
number of spans | 5 | |
height above valley floor or water | max. 20 m | |
number of lanes | 2 | |
roadway / carriageway width | 7.00 m | |
longitudinal slope | 2.80 % | |
walkway width | 3.0 m | |
cycleway width | 3.0 m | |
piers | number | 4 |
Quantities
structural steel | 2 000 t |
Cost
cost of construction | ca. Euro 25 000 000 |
Materials
piers |
steel
|
---|---|
deck truss |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Chronology
February 2009
— June 2009 |
Demolition of the existing footbridge. |
---|---|
2 July 2009 | The client "Grand Poitiers" decides to build a new viaduct to replace the Viaduc des Rocs in Poitiers. |
December 2009 | The design-build competition for the new "Viaduc des Rocs" is launched. |
May 2010 | The contract to design and build the bridg is awarded to a joint venture composed of the contractors GTM Bretagne, EBL Centre and Freyssinet, as well as engineering firm RFR. |
23 January 2012 | The existing bridge is closed for demolition. |
March 2012 | The foundation works for the new piers are started. |
November 2012 | Temporary works and the first pier are erected on site. |
May 2013 | Erection of the steel structure is completed along with the welding works. |
May 2013
— October 2013 |
All supports including abutments are completed. |
Summer 2013 | The concrete deck is placed onto the steel structure. |
September 2013 | Completion of technical and ancillary equipment such as deck finishes, railing, lighting and the express bus station on the bridge. |
6 February 2014 | The viaduct is officially opened. |
May 2014 | The express bus station on the bridge is opened. |
New Leon Blum Viaduct in Poitiers
The new crossing spans over a large high speed rail station and the Boivre river valley running through the center of Poitiers. It replaces a concrete footbridge, now demolished, and expands the functionality of the crossing. It does so by providing access to the city center via a BRT bus network (Bus Rapid Transit), and a BRT station on its deck as part of bridge design. The new bridge therefore plays strategic role for the city development at a large scale.
The design consists of a 310 meter long composite truss. It is divided into 5 spans, with a main span of 81 meters. Of critical importance for the design was the integration of the project into the city surroundings and the railway platforms. The height of the structure over the station platforms increased the aesthetic requirements for the soffit. The truss system superstructure is continuous with the bridge piers that are articulated at their base. With this design, one perceives a cohesive tubular structure emerging from the footings.
Construction over active high speed rail required careful coordination with the rail operators and limited erection time during several nightly closures. Steel segments and pre-casting of the concrete deck and underside panels reduced site activities and lifts over the railway. In addition, the design build procurement allowed the design and construction to be fully integrated and streamlined the design, fabrication, and construction schedule.
The extensive studies carried out during detail design stage allowed to design a viaduct in full conformity and coherence with the initial conceptual vision. During this design process, the sections of the structural components have been optimized and refined to emphasize the slenderness of the architectural composition.
Participants
- Michel Desvignes (landscape architect)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20066589 - Published on:
17/10/2014 - Last updated on:
05/12/2017