General Information
Name in local language: | Donaubrücke Leipheim |
---|---|
Beginning of works: | 1935 |
Status: | demolished (1999) |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Reinforced concrete bridge |
Structure: |
Three-hinged arch bridge |
Location
Location: |
Leipheim, Günzburg (Kreis), Bavaria, Germany |
---|---|
Crossed: |
|
Carried: |
|
Part of: | |
Replaced by: |
Leipheim Bridge (A8) (2001)
|
Coordinates: | 48° 26' 49.15" N 10° 12' 22.86" E |
Technical Information
Dimensions
total length | 359.22 m | |
rise:span | 1:7 | |
span lengths | 73 m - 80 m - 85 m - 78 m | |
number of spans | 4 |
Materials
deck |
reinforced concrete
|
---|---|
arches |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pontifex Maximus. Der Architekt Paul Bonatz und die Brücken. Verlagshaus Monsenstein und Vannerdat OHG, Münster (Germany), ISBN 978-3-86991-176-2, pp. 298–309, 536–538, 619+. (2011):
- Über Eisenbetonbrücken mit Rippenbogen unter Mitwirkung des Aufbaues. In: Schweizerische Bauzeitung (1883-1946), v. 112, n. 24 (10 December 1938), pp. 287-293. (1938):
- About this
data sheet - Structure-ID
20010243 - Published on:
07/09/2003 - Last updated on:
07/02/2020