General Information
Name in local language: | Donaubrücke Leipheim |
---|---|
Beginning of works: | 1999 |
Completion: | 2001 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Leipheim, Günzburg (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Replaces: |
Leipheim Bridge (A8)
|
Coordinates: | 48° 26' 49.48" N 10° 12' 22.57" E |
Technical Information
Dimensions
total length | 375 m | |
number of spans | 6 |
Cost
cost of construction | German Mark 15 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010244 - Published on:
07/09/2003 - Last updated on:
07/02/2020