0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Laives Bypass Viaduct
Completion: 21 December 2013
Status: in use

Project Type

Location

Location: , , ,
Connects to: Leifers Bypass Tunnel (2013)
Coordinates: 46° 24' 45.92" N    11° 19' 49.79" E
Show coordinates on a map

Technical Information

Dimensions

number of lanes 2 x 1

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Case Studies and Applied Products

TENSA®FINGER RSFD – Cantilever finger joints

TENSA®FINGER RSFD – Cantilever finger joints

The RSFD Cantilever Finger Joint consists of massive steel edge profiles with finger plates that are connected to the lower construction on either side of the bridge gap.

[more]

Participants

Expansion joints

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070635
  • Published on:
    03/02/2016
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine