General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Twimberg, Bad Sankt Leonhard im Lavanttal, Carinthia, Austria |
---|---|
Next to: |
Talübergang Lavant (1981)
|
Coordinates: | 46° 55' 16" N 14° 50' 22" E |
Technical Information
Dimensions
total length | 900 m | |
height above valley floor or water | 165 m |