General Information
Project Type
Construction method: |
Balanced lift method |
---|---|
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Material: |
Prestressed concrete bridge |
Structure: |
Rigid frame bridge with V-shaped legs |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Deutsch Kaltenbrunn, Burgenland, Austria Fürstenfeld, Styria, Austria |
---|---|
Part of: | |
See also: |
Lahnbachbrücke S7 (2020)
|
Coordinates: | 47° 3' 47.06" N 16° 5' 40.48" E |
Technical Information
Dimensions
span lengths | 2 x 58.00 m | |
number of spans | 2 | |
number of lanes | 2 x 2 | |
roadway / carriageway width | 2 x 12.00 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Egg-Graben-Brücke, Wildbrücke AM2, Lafnitzbrücke – Anwendung von neuen Bauverfahren für Brücken in Österreich. Presented at: 25. Dresdener Brückenbausysmposium, 9./10. März 2015, Dresden (Germany). (2015):
- Erfahrungsbericht aus Österreich über die Anwendung von neuen Bauverfahren im Brückenbau. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 73-84. (2019):
- About this
data sheet - Structure-ID
20077180 - Published on:
04/04/2019 - Last updated on:
04/04/2019