0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2019
Completion: 2020
Status: under construction

Project Type

Location

Location: , ,
Part of:
See also: Lafnitzbrücke S7 (2020)
Coordinates: 47° 3' 50.22" N    16° 6' 0.70" E
Show coordinates on a map

Technical Information

Dimensions

number of lanes 2 x 2
roadway / carriageway width 2 x 12.00 m

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20077181
  • Published on:
    04/04/2019
  • Last updated on:
    04/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine