General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Rigid frame bridge |
---|---|
Function / usage: |
Monorail bridge |
Construction method: |
Precast concrete elements with in-situ joints |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Kuala Lumpur, Kuala Lumpur, Malaysia |
---|---|
Part of: | |
Coordinates: | 3° 8' 7.35" N 101° 41' 38.75" E |
Technical Information
Dimensions
main span | ca. 50 m | |
span lengths | 25 m - 50 m - 25 m | |
number of spans | 3 | |
girder depth | 2.20 - 2.60 m |
Materials
piers |
reinforced concrete
|
---|---|
guideway beams |
precast prestressed concrete
|
Participants
Alternative design
- Köhler + Seitz Beraten und Planen GmbH (superstructure)
Structural engineering
- PJS International Sdn. Bhd. (substructure)
-
Köhler + Seitz Beraten und Planen GmbH
(guideway beams)
- Nicolas Janberg (structural engineer)
- Nico Schmidt (structural engineer)
Contractor
- Genesis Structural Systems Sdn. Bhd (superstructure)
Bearings
Project management
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20004020 - Published on:
29/06/2002 - Last updated on:
25/07/2017