General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Haunched girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 1 872 m | |
span lengths | 60 m - 95 m - 13 x 120 m - 95 m - 60 m | |
number of spans | 17 | |
height above valley floor or water | 88 m | |
piers | height | 17.7 - 79.7 m |
height | max. 80 m | |
deck depth at abutments | 16 |
Quantities
concrete volume | 120 000 m³ | |
deck | concrete volume | 43 400 m³ |
prestressing steel | 750 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Structural engineering
Consulting engineers
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- DYWIDAG Multistrand Tendons secure one of the largest Interstate Bridges in Hungary. Köröshegyi Bridge, M7 Interstate, Hungary. In: DSI Info, n. 15 ( 2007- 2008), pp. 24.
- DYWIDAG-Spannglieder sichern eine der größten Autobahnbrücken in Ungarn. Brücke Köröshegyi, M7 Autobahn, Ungarn. In: DSI Info, n. 15 ( 2007- 2008), pp. 24.
- Hungarian viaduct steps across valley. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 14.
- Koroshegy Viaduct. In: Structural Engineering International, v. 16, n. 1 (February 2006), pp. 36-38. (2006):
- Lakeside Link. In: Bridge Design & Engineering, v. 12, n. 45 (4th Quarter 2006), pp. 28-29. (2006):
- About this
data sheet - Structure-ID
20018255 - Published on:
31/10/2005 - Last updated on:
05/02/2016