General Information
Completion: | March 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-prestressed concrete composite bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Warren type truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 268 m | |
span lengths | 51.85 m - 2 x 85.0 m - 43.85 m | |
number of spans | 4 | |
deck | deck depth | 6.200 m |
deck width | 11.15 m | |
upper deck | roadway / carriageway width | 10.500 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
prestressed concrete
|
abutments |
reinforced concrete
|
bottom flange |
prestressed concrete
|
diagonals (truss) |
steel
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and Construction of the first composite truss bridge in Japan: Kinokawa Viaduct, Wakayama, Japan. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 250-251. (2004):
- About this
data sheet - Structure-ID
20038981 - Published on:
11/08/2008 - Last updated on:
12/09/2021