General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Meiningen, Schmalkalden-Meiningen, Thuringia, Germany |
---|---|
Carries: |
|
Part of: |
|
Connects to: |
Eichelberg Tunnel (2005)
|
Coordinates: | 50° 30' 22.97" N 10° 26' 42.92" E |
Technical Information
Dimensions
main span | 45 m | |
total length | 369 m | |
height above valley floor or water | max. 25 m | |
deck | deck depth | 3.0 m |
deck width | 2 x 14.25 m |
Materials
deck |
prestressed concrete
|
---|
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20028240 - Published on:
01/06/2007 - Last updated on:
05/02/2016