0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Saint Francisville Bridge
Beginning of works: May 2006
Completion: 5 May 2011
Status: in use

Project Type

Awards and Distinctions

2012 Merit Award  

Location

Location: , , ,
, , ,
Crosses:
  • Mississippi River
Coordinates: 30° 43' 13" N    91° 21' 7" W
Show coordinates on a map

Technical Information

Dimensions

main span 482.5 m
total length 3.9 km

Cost

cost of construction United States dollar 334 700 000

Case Studies and Applied Products

TENSA®FINGER GF – Sliding Finger joints

TENSA®FINGER GF – Sliding Finger joints

The mageba GF Sliding Finger Construction is a robust Finger Expansion Joint for high requirements with regard to moveability (up to 1,000 mm), riding comfort and durability.

[more]
TENSA®FINGER RSFD – Cantilever finger joints

TENSA®FINGER RSFD – Cantilever finger joints

The RSFD Cantilever Finger Joint consists of massive steel edge profiles with finger plates that are connected to the lower construction on either side of the bridge gap.

[more]

Chronology

May 2006

Construction begins.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20019968
  • Published on:
    12/03/2006
  • Last updated on:
    01/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine