General Information
Project Type
Structure: |
Multiple T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Structure: |
Single T-section girder bridge Double T-section girder bridge Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 1 262.70 m | |
bridge surface | 39 500 m² | |
abutments | number | 6 |
piers | number | 115 |
Section Flyover (F0-F35) | ||
---|---|---|
main span | 32.00 m | |
width | 2 x 13.40 m | |
length | 854 m | |
on-center distance between girders | 1.98 m | |
deck slab thickness | 20 cm | |
girder depth | 1.10 m | |
standard span lengths | 24.40 m | |
roadway / carriageway width | 2 x 3 × 3.65 m | |
Section Overpass | ||
width | 9.50 m | |
length | 563 m | |
span lengths | 24.40 - 34.15 m | |
girder depth | 1.36 m | |
roadway / carriageway width | 2 x 3.65 m | |
piers | width | 3.00 m |
thickness | 1.40 m | |
Section 1 | length | 116 m |
Section 2 | length | 157 m |
Section 3 | length | 290 m |
Section Roundabout | ||
horizontal radius of curvature | 76 m |
Design Loads
design code(s) | BS 5400 Parts 1-4 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
(B 45)
|
Participants
Owner
Design
Structural engineering
Precastor
Prestressing steel
Elastomeric bearings
Expansion joints
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Jinnah-Brücke, Phase II, in Karatschi, Pakistan. In: Beton- und Stahlbetonbau, v. 92, n. 4 (April 1997), pp. 99-105. (1997):
- About this
data sheet - Structure-ID
20010934 - Published on:
07/12/2003 - Last updated on:
05/02/2016