General Information
Official designation: | B 472 BW 5 (8235543 0) |
---|---|
Beginning of works: | 1979 |
Completion: | 1981 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Double T-section girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bad Tölz, Bad Tölz-Wolfratshausen, Bavaria, Germany |
---|---|
Address: | B 472 |
Crosses: |
|
Coordinates: | 47° 45' 16.34" N 11° 33' 23.08" E |
Technical Information
Dimensions
main span | 53.09 m | |
deck depth | 3.25 m | |
total length | 132.8 m | |
span lengths | 38.9 m - 53.1 - 38.9 m | |
deck width | 15.35 m | |
number of spans | 2 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1979-1981)
Owner
Client
Design
Structural engineering
Checking engineering
- Karl Heinisch (checking engineer)
Contractor
Recalculation to current codes
Client
Structural engineering
Checking engineering
-
Konstruktionsgruppe Bauen AG, Kempten
- Norbert Nieder (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20071080 - Published on:
12/04/2016 - Last updated on:
12/04/2016