0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 6 February 2011
Status: in use

Project Type

Awards and Distinctions

Location

Location: ,
Coordinates: 34° 15' 26.70" N    133° 11' 14.22" E
Show coordinates on a map

Technical Information

Dimensions

total length 515 m
span lengths 98 m - 315 m - 98 m
number of lanes 1
roadway / carriageway width 4.5 m
walkway width 2.5 m
vertical navigation clearance 24.5 m
horizontal navigation clearance 100 m
pylon P1 height 94.600 m
thickness 4.500 m
pylon P2 height 93.600 m
thickness 4.500 m

Cost

cost of construction Japanese yen 4 100 000 000

Materials

piers reinforced concrete
pylons reinforced concrete
abutments reinforced concrete
central section of main span steel
side spans prestressed BCV® high-strength fiber-reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086955
  • Published on:
    19/09/2023
  • Last updated on:
    20/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine