0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: February 2008
Completion: September 2010
Duration of works: 32 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A4
Part of:
Coordinates: 50° 56' 44" N    10° 29' 15" E
Show coordinates on a map

Technical Information

Dimensions

length 445.00 m
span lengths 21.00 m - 28.00 m - 9 x 37.00 m - 35.00 m - 28.00 m
number of spans 13
bridge surface 16 020 m²
total width 36.00 m
deck on-center distance between girders 9.00 m
girder depth 1.85 m
roadway / carriageway width 2 x 14.75 m

Quantities

deck concrete volume 12 450 m³
prestressing steel 400 t
reinforcing steel 1 265 t
substructure concrete volume 7 415 m³
reinforcing steel 1 106 t

Cost

cost of construction Euro 16 300 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20019244
  • Published on:
    30/01/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine