General Information
Beginning of works: | February 2008 |
---|---|
Completion: | September 2010 |
Duration of works: | 32 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Double T-section girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Hörselberg-Hainich, Wartburgkreis, Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 56' 44" N 10° 29' 15" E |
Technical Information
Dimensions
length | 445.00 m | |
span lengths | 21.00 m - 28.00 m - 9 x 37.00 m - 35.00 m - 28.00 m | |
number of spans | 13 | |
bridge surface | 16 020 m² | |
total width | 36.00 m | |
deck | on-center distance between girders | 9.00 m |
girder depth | 1.85 m | |
roadway / carriageway width | 2 x 14.75 m |
Quantities
deck | concrete volume | 12 450 m³ |
prestressing steel | 400 t | |
reinforcing steel | 1 265 t | |
substructure | concrete volume | 7 415 m³ |
reinforcing steel | 1 106 t |
Cost
cost of construction | Euro 16 300 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Architecture
- Ursulina Schüler-Witte (architect)
- Ralf Schüler (architect)
Structural engineering
- HOCHTIEF Consult Infrastructure
- Ingenieurgemeinschaft Setzpfandt GmbH & Co. KG
- KREBS+KIEFER Ingenieure GmbH
Geotechnical/geological experts
Checking engineering
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 53-80.
- About this
data sheet - Structure-ID
20019244 - Published on:
30/01/2006 - Last updated on:
05/02/2016