0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hin Keng to Diamond Hill Tunnels

General Information

Beginning of works: 2013
Completion: 2018
Status: under construction

Project Type

Function / usage: Metro tunnel / subway tunnel
Construction method: Drilling and blasting
Structure: Tunnel

Location

Location: , ,
, ,
Part of:
Coordinates: 22° 21' 38.26" N    114° 10' 14.94" E
Show coordinates on a map

Technical Information

Dimensions

total length 3 877 m

Case Studies and Applied Products

Shatin to Central Link: Hong Kong's new railway connection

Shatin to Central Link: Hong Kong's new railway connection

The Shatin to Central Link (SCL) is a new 17 km railway connection that runs through several districts of Hong Kong. Once completed, the SCL will significantly shorten travel time between East Kowloon, the eastern, western and northern N ... [more]

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070951
  • Published on:
    10/03/2016
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine