General Information
Project Type
Structure: |
Unbraced tied-arch bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Road bridge |
Location
Location: |
Marl, Recklinghausen (Kreis), North Rhine-Westphalia, Germany |
---|---|
Crossed: |
|
Replaces: |
Hervester Brücke (1950)
|
Coordinates: | 51° 40' 0" N 7° 1' 34.30" E |
Technical Information
Quantities
structural steel | 450 t | |
volume of earthworks | 25 000 m³ | |
substructure | concrete volume | 500 m³ |
Cost
construction cost (without tax) | Euro 4 773 443 |
Materials
deck |
steel
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Client
Structural engineering
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20074242 - Published on:
20/11/2017 - Last updated on:
26/11/2017