0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): C-Train SE/Bridgeland Bridge
Completion: 1985
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Bow River
Part of:
Coordinates: 51° 2' 57.88" N    114° 3' 1.62" W
Show coordinates on a map

Technical Information

Dimensions

number of tracks 2
track gauge 1 435 mm

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20089878
  • Published on:
    06/12/2024
  • Last updated on:
    06/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine