General Information
Project Type
Structure: |
Three-span extradosed bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 320 m | |
span lengths | 45 m - 60 m - 100 m - 60 m - 45 m | |
number of spans | 5 | |
horizontal radius of curvature | 1 300 m | |
total width | 20.654 m | |
roadway / carriageway width | 2 x 8.00 m | |
pylons | width | 2.000 - 2.500 m |
thickness | 1.000 - 1.300 m | |
pylon height (above deck) | 16.250 m |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Case Studies and Applied Products
Harpe Bru – Norway's first extradosed cable-stayed bridge
In the course of the European Route E6 expansion in Norway, the plans include a 320 m long bridge which spans the Gudbrandsdalen Lågen river. For the bridge superstructure, PERI civil engineering technology experts developed a balanced c ... [more]
Participants
Owner
Design
Checking engineering
Contractor
Formwork & shoring
Relevant Web Sites
- About this
data sheet - Structure-ID
20070996 - Published on:
21/03/2016 - Last updated on:
09/07/2017