0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

One particular challenge during the formwork planning was taking into consideration the 130 cm high transverse ribs on each bridge segment.

One particular challenge during the formwork planning was taking into consideration the 130 cm high transverse ribs on each bridge segment.

Media-ID: 252342
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 29/02/2016

More media of this structure

Norway (2015)

More media for this product/service available at: