0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Hammersmith Viaduct
Beginning of works: January 1960
Completion: 16 November 1961
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 51° 29' 27.20" N    0° 13' 50.61" W
Coordinates: 51° 29' 27.08" N    0° 13' 3.25" W
Show coordinates on a map

Technical Information

Dimensions

main span 42.7 m
width 18.6 m
total length 622 m
number of spans 16

Chronology

23 December 2011
— Until 12 January 2012

After the discovery of structural defects to the ageing structure the flyover is closed to all traffic.

13 January 2012
— Until 27 May 2012

While repair works are on-going the bridge is re-opened to traffic but limited to one lane in each direction.

Participants

Initial construction (1960-1961)
Architecture
Structural engineering
Strengthening (2014-2015)
Client
Monitoring equipment

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066334
  • Published on:
    06/08/2014
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine